Contact
Chat
Email
Tel

CWD Series Sludge Handling Cranes

Lifting Capacity: 5t-16t
Span: 7.5m~16.5m
Working Class: A7,A8
In the sludge station where the waste is burned, semi-fluid sludge is unloaded by trucks into storage bunkers. In the bunker, the sludge handling crane transfers the sludge into a storage area. From the storage area, the crane feeds the sludge to a process line.

Overview

In the sludge station where the waste is burned, semi-fluid sludge is unloaded by trucks into storage bunkers. In the bunker, the sludge handling crane transfers the sludge into a storage area. From the storage area, the crane feeds the sludge to a process line.
Features:
Sludge handling cranes must be Optimization design to ensure safe, high-speed transport of high viscosity, semi-liquid materials, which requires the operating line equipped with the suitable function of the crane. The viscosity of the sludge material is very large, through the special handling of the grab, not only can quickly grab the sludge, but also should not overload of lifting mechanism as large viscosity. We have considered this point when we ensure the crane structure and the dimension of machinery. We usually used a automatic crane with continuous operation in this working environment through advanced intelligent control technology and monitoring method to ensure that the crane efficient and excellent complete the task.

CONTACT US NOW?

We respond quickly to any questions, inquiries, needs and feedback. Have business needs or questions about our products? Feel free to contact us.

CONTACT US

We respond quickly to any questions, inquiries, needs and feedback. Have business needs or questions about our products? Feel free to contact us.

Name:    (* Required)

Company:    (* Required)

Job title:    (* Required)

Country:

Email:    (* Required)

Phone:

Please call me back

Your Industry:

Others:

0086-371-5532 8269
Ext. 1039